Central Library Project
Repurposing Education Square
Prem Public Library
A Library for Lincoln's Future. A Place for Everyone.
Lincoln's new downtown library is taking shape at 1111 O St. Named in recognition of Drs. M.K. and Prem Bansal and their generous gift to the City of Lincoln, Prem Public Library will provide a welcoming space for learning, connection and community.
The meaning behind the name
Prem (pronounced “prame,” rhymes with name) is a Sanskrit and Hindi word meaning love — a selfless, universal love that widens to create community. More information about the name is available here.
The name reflects the Bansal family's commitment to education, lifelong learning, public service and community. The couple raised their three children in Lincoln, where the downtown library was a familiar part of their childhood.
About the project
Prem Public Library will offer modern, welcoming spaces for reading, learning, technology and community activities. The new library represents a significant investment in downtown Lincoln and the future of library services in our community.
Location
1111 “O” Street — the former Southeast Community College (SCC) Education Square building
- 89,000 square feet
- Includes attached, City-owned parking garage with 1,057 spaces
- Direct skywalk connections to downtown buildings
- Formerly known as Centrum Mall (opened in 1979)
- SCC has occupied portions of the building since 1995
Vision for a Modern Central Library
Lincoln’s new central library will be a dynamic, 21st-century space designed to support lifelong learning, creativity, and community connection.
Key Features Will Include:
- Flexible community spaces
- Interactive youth areas
- Makerspace & digital labs
- Rooftop auditorium
- Quiet reading room
- Coffee shop open beyond library hours
Cost-Effective Investment
- $60.4 million total project cost
- 56% – 44% Cost share between City funding and private philanthropy
- Substantially less costly than renovating Bennett Martin or building a new facility
Funding Breakdown:
- $23.8M municipal improvement bonds
- $26.5M in private contributions
- $10.1 million in other city funding
- No general obligation bond required
Why Repurpose?
- Reduces cost while meeting long-term library goals
- Speeds up timeline compared to new construction
- Builds on Southeast Community College’s strong partnership with the City
Project Timeline
- Fall 2026: Interior demolition
- 2027-2028: Construction
- Fall 2028: Library opens
Background
The existing Bennett Martin Public Library, located at 136 S. 14th Street, was built in 1962 with additions in 1968 and 1978. It no longer meets modern library needs in terms of space, accessibility, and function.